Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Alan Hoeffler
AZ 86305↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Stephania Williams
AZ 85253-3576↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Sara Marisa
AZ 85118-7324↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Dara Rider
AZ 85144-4777↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Barbara Hanson
AZ 85748-7610↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Lenore Kester
AZ 85602-2091↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Sharon Daskal
OH 44122↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m deeply concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective ...↓of Arizona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Lenard Milich
AZ 85718-1907↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Charlotte Reichert
AZ 85193-9475↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Grace Gutierrez
AZ 85396-7104↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Kathy Colletti
AZ 85308-9552↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Beth Larson
AZ 85224-4057↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Peggy Ford
AZ 85714-1103↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Patricia Scutier
AZ 85621-2324↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Lauren Shaw
AZ 85254-5737↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Theodore Mouras
AZ 85615-9041↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Cheryl Eames
AZ 85373-1402↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
T. Stephen Cody
AZ 85756-9199↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Thomas Stander
AZ 85901-7939↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Ken L.
AZ 86442-4923↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Jerene Morrison
AZ 86334-2883↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Mitchell Cholewa
AZ 85213-2254↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
George Fisher
AZ 85326-3225↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Glen Wetzel
AZ 85374-5774↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. Sadly, it appears that the plan design proposed in Hudbay Minerals’ application is significantly worse tan the desi...↓gns previously submitted by the then owners of the Rosemont MIne -- i.e., less protective of Arizona’s public health, environment and groundwater. What's up with that?
Some troubling aspects of Hudbay Minerals’ application -- it proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality doesn't seem protective of the quality of Arizona's environment -- on the contrary, the polluter is favored at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Thank you for your attention to this critical matter.
Sincerely,
Cheryl Purvis
AZ 85716-5529↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Paula Hartgraves
AZ 85750-2925↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Aletris Neils
AZ 85745-9737↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
Tucson residents have previously suffered heart and developmental defects from corporate poisoning of ground water. In addition, Tucson and the surrounding areas, including and especially the Santa Rita mountains, draws tourists because of its natural, unscarred beauty. It is essential that this project is rejected!!!!
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable.
I prefer that this project is BLOCKED/STOPPED COMPLETELY!! But I understand that it is very difficult to stop big mining. So I request AS A BARE MINIMUM that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Anne Pollack
AZ 85749-8889↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Andrew Means
AZ 85119-8915↓
No attachments
Dear Bernice Manuelito,
The plan design proposed in Hudbay Minerals’ application is dangerous and much less protective of Arizona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine, ...↓which were also deficient but at a smaller scale.
Hudbay Minerals’ application wants to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by ADEQ appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. ADEQ must protect the state’s water and public health by including the following strict requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential designs.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. ADEQ must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better utilization of industry-standard technologies by Hudbay Minerals to minimize pollution. I ask that ADEQ require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Emilio Falco
AZ 85646-0103↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Adelle Ribeiro
AZ 85023-6561↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Tracy Scheinkman
AZ 85748-7924↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
John Linda
AZ 85283-3203↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Howard baldwin
AZ 85705-7737↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Eleanor Thomas
AZ 85750-9739↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
shannon rancourt
AZ 85255-2395↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Erick Meza
AZ 85712-1321↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m extremely concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protecti...↓ve of Arizona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s beyond unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Crystal Richt
AZ 85716-3838↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Sue Johnston
AZ 85018-6999↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Jennifer Cline
AZ 85310-4184↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
CINDY YATES
AZ 85282-4231↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
CINDY KELLIE
AZ 85730-2734↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
The problem we have here and going forward with many mines is the lack of appropriate laws to govern today’s landscape.
Thank you.
Sincerely,
Marilyn Petrich
AZ 86338-0137↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Brandon Burr
AZ 85254-3085↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I live in Tucson, so this affects me in ways that are immediately visible. I’m really concerned that the plan design...↓ proposed in Hudbay Minerals’ application is significantly less protective of Arizona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Shane Baker
AZ 85716-5753↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Carol Kemmerer
AZ 85051-1021↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Timothy Fagan
AZ 85704-4908↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
David and Janis Labiner
AZ 85750-1221↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Vicki Schuck
AZ 86314-3149↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Cristina Perelman
AZ 85750-6267↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Debra Dillon
AZ 85251-7014↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
M Timmins
AZ 85747-9223↓
No attachments
Dear Bernice Manuelito,
To the Department whose sole task is environmental QUALITY:
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay...↓ Minerals’ application is significantly less protective of Arizona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Jana Shakarian
AZ 85226-2279↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Julie Miles
AZ 85053-1029↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Nancy Andrews
AZ 85743-5547↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Candace Russell
AZ 85035-2100↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Margaret Fularczyk
AZ 85374-4324↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Barbara Stevens
AZ 85755-5837↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Brent Hendricks
AZ 85705-7764↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Water is an increasingly rare resource in this state, and allowing an already toxic and pollutant-heavy industry to threaten it is unacceptable.
Sincerely,
TEDDY GINGERICH
AZ 85254-2458↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Victoria Jackiw
IL 60706-2809↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
April Fennell
AZ 85250-7431↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Katarina Lang
AZ 85018-2400↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Debra Cook
AZ 86314-5859↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit.
Tucson has enough challenges to its water supply already. Now Hudbay Minerals’ application proposes to use water ...↓to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
Please don't allow Hudbay to pollute at the expense of people and the environment. That’s unacceptable. I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Karen Mockler
AZ 85716-5127↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
David T Steere Jr
AZ 85704-7731↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indul...↓gent of the polluter at the expense of people and the environment. That’s unacceptable.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The plan design proposed in Hudbay Minerals’ application is significantly less protective of Arizona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine. I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Thomas Hicks
AZ 85718-5844↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Harry Heintz
AZ 85248-6176↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Stephanie Snedeker-Folkerth
AZ 85308-7260↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Carrie Chaffin
AZ 86403-6796↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Andrew Scholten
AZ 86303-4656↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Michael And Valerie Welborn
AZ 85718-6602↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Tobey Thatcher
AZ 85629-0840↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Christina Teunissen
AZ 85331-5036↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Leticia Garcia
AZ 85252-0274↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Sheri Scholten
AZ 85209-3602↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Joanne Doherty
AZ 85262-5622↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Belinda Fairbanks
AZ 85119-3281↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Theodore Beloin
AZ 85711-2806↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Jeanne Emmerson
AZ 85630-0641↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Victoria Khalidi
AZ 85745-5092↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Jessica Andrews
AZ 85718-1207↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Teresa Wall
AZ 85204-6112↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Ellen Russell
AZ 85750-6332↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Michael Lee
AZ 85383-6662↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Susan Markey
AZ 85712-1135↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Kim Chmel
AZ 85262-7776↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Terri Eckles
AZ 85365-6006↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Virgil Swadley
AZ 85743-8786↓
No attachments
Dear Bernice Manuelito,
I do not want this project destroying our precious environment. There must be a better way. Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the p...↓lan design proposed in Hudbay Minerals’ application is significantly less protective of Arizona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Cristina Williams
AZ 85711-4152↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
JoAnn Sheperd
AZ 85718-7230↓
No attachments
Dear Bernice Manuelito,
I love the Santa Rita Mountains! Such beauty, such diversity. Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay ...↓Minerals’ application is significantly less protective of Arizona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Dan Meyer
AZ 85719-3234↓
No attachments
Dear Bernice Manuelito,
As a mother of two I care deeply about the planet we will leave to our children, and to theirs. Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that t...↓he plan design proposed in Hudbay Minerals’ application is significantly less protective of Arizona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Michaela Carter
AZ 86305-2259↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
This is not acceptable for any company in light of water resource shortages here in Arizona, as well as thinking that taking wildlife habitat is acceptable to those who live here.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested. That is not acceptable as water is highly valued and protected in these cities.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s extremely unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year. More content analysis is better.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Thank you again for allowing comments on this. Hudbay Minerals must accept that mining in Arizona is unique due to lack of abundance of resources and our need to preserve unique wildlife habitat. The company headquarters isnt here and doesn't have to face the mine everyday. Hudbay Minerals does not prioritize Arizona's best interests in their plans. Mining today must be done responsibly and with respect to where the mine is.
Sincerely,
Jerralynn Krinks
AZ 85745-1563↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment, and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That is unacceptable. Therefore, I request that the Arizona Department of Environmental Quality protect the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP, which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements, and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Jennifer Ault
AZ 85755-1913↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
David Nelson
AZ 85715-5016↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Marilee Russo
AZ 85935-8543↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Joan Scurran
AZ 85750-7047↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
BRYE MYLES
AZ 85143-4874↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.