Lake Tapps Reservoir Water Rights and Supply Project
Dear Bernice Manuelito,
I have concerns that the Copper World project's draft aquifer-protection permit. I’m concerned the plan in Hudbay Minerals’ application does not do any more to protect Arizona’s public health, environment and groundwater th...↓an the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution should be required - I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Thank you.
Sincerely,
Renee Barnette
AZ 85338-5221↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Marlene Manzer
AZ 86326-4650↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the proposed design in Hudbay Minerals’ application is significantly less protective of both the ...↓health of Indigenous Arizonans and that of the Arizona public at large than the designs submitted by previous owners of the Rosemont Mine. Furthermore, I fear the local habitat and groundwater supply will be severely and negatively impacted by this newly-proposed design.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality is dangerously indulgent of the polluter, which places the safety of Arizona locals and the environment at risk. As someone with friends heralding from Native lands, I am appalled by such actions. So I implore the Arizona Department of Environmental Quality to protect the state’s water and public health by enforcing the following stringent standards in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Paul Westermann
AZ 85281-6612↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Jessica LoCicero-Walsh
AZ 86005-8859↓
No attachments
Dear Bernice Manuelito,
This email represents my ardent support for the following changes to the draft permit for the Copper World project. Personally, I don't think they go far enough. I am simply shocked that we are still fighting to protect the...↓ Santa Rita Mts. from destructive mining practices. The solution should be clear. Get mining out of our desert!
Once we lose it, it won't come back.
Porter McDonald
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Arizona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Porter McDonald
AZ 85713-3927↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Hudbay Minerals needs to shape up or ship out!
Sincerely,
John E Miller
AZ 85749-9419↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Lela Miller
AZ 85383-5724↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Jeanne Lemieux
AZ 85743-1162↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Connie Scott-Graham
AZ 85743-9041↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Sally Hammond
AZ 85741-3007↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Julie Munoz
AZ 85704-1542↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Richard Barker
OR 97007-8302↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Lindie Brown
NE 68901-4809↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Carol Goerke
AZ 85281-6810↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Nanci Cox
TX 76901-5119↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Emily Ravits
AZ 85750-6351↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Diane Feldmayer
AZ 85715↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Erik Flodin
AZ 85310-4208↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Lois Nottingham
AZ 86304-2799↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Kenneth Porter
AZ 85713-4401↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
C R
AZ 85225-2664↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Patricia Stern
AZ 85745-8874↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Mike Weiner
AZ 85255-8026↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine. This is utterly unacceptable.
As I believe you must be aware, Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Gretchen Beaubier
AZ 85296-2341↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
James Fishgold
AZ 85614-5494↓
No attachments
Dear Bernice Manuelito,
I wish to provide comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Arizona’s public heal...↓th, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Joni Stellar
AZ 85624-6096↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Robert Martin III
AZ 85269-0230↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Di Collis
AZ 85361-8549↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Zoe Macisaac
AZ 85013-2001↓
No attachments
Dear Bernice Manuelito,
Regarding the Rosemont Mine, please do not allow the mining company to police its own work. Everyone knows mining companies don’t take care of the environment, and when left to their own devices they’ll leave this site a to...↓tal mess. Not to mention what they’ll allow to seep into the groundwater in the interest of saving some pennies for their investors and the board.
As an Arizona citizen I’m quite concerned about the use of the land as well as resulting pollution to an area from extraction corporations against whom I seem to have no individual voice. So, I’m putting my name on the below message from those who are monitoring much more closely. Please don’t throw away Arizona’s natural heritage to those who won’t safeguard it.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent to the polluter at the expense of people and the environment. That’s unacceptable. I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Gregory Ely
AZ 85715-3018↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Dianna Kilroy
MI 49766-9537↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Brian Jones
AZ 85743-5245↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Fred Anderson
AZ 85716-1800↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Michael Lacome
AZ 85377-2824↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Wendy Morris
AZ 85013-2917↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Laura Boden
AZ 85033-2807↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Richard Barker
OR 97007-8302↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Sandi Aden
NE 68521-1554↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Dianne Douglas
AZ 85042-7082↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Patrick Diehl
AZ 85719-2123↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Mary Kennedy Ice
AZ 85755-5944↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
We are trying to conserve water, in Arizona, to provide drinking water and water for farming, and Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Kathryn Kaffer
AZ 85705-1978↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
My Partner and I own land very close to where this mine is trying to locate, and frankly, we both do not want to see this happen. Not only are you going to poison our groundwater, but you are also taking away natural habitat that is essential for many of our desert wildlife to live. We are not above nature!
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Natasha Ivanov
AZ 85716-4728↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Gary Vargo
AZ 85267-2595↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
John Rush
AZ 85658-5093↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
George Page
AZ 85249-5416↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Jacob Richards
AZ 85711-2206↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Suzanne Szkodzinski
AZ 85028-1919↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Marti Burgan
AZ 86301-4414↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Tobey Thatcher
AZ 85629-0840↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Gwen Detlefsen
AZ 85373↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine. Using previous water, ravaging, polluting, spoiling and killing Jaguar habitat & this majestic region should not occur - go mine somewhere else!
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Mike Friel
AZ 85719-4348↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Timothy Spurlin
AZ 85016-1531↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Vanessa Hill
AZ 85621-9756↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Gwen Detlefsen
AZ 85373↓
No attachments
Dear Bernice Manuelito,
I'm a native of Southern AZ and thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is signi...↓ficantly less protective of Arizona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024. Please do the right thing for the region and its inhabitants.
Sincerely,
Benjamin Cruz
AZ 85255-6375↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Myriam Oviedo
AZ 85718-2958↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Catherine Grossman
AZ 85716-3240↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Laura Walls
AZ 85715-5604↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Rose Kugler
AZ 86305-3844↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Julie Flaim
AZ 85053-1820↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Kim Antieau
AZ 85748-2084↓
No attachments
Dear Bernice Manuelito,
I appreciate the opportunity to submit comments on the Copper World project's draft aquifer-protection permit. I’m very concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protectiv...↓e of Arizona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Peggy Sanders
AZ 85710-7305↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Mark Hodgson
AZ 85282-2738↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Gary McCormick
AZ 85713-4514↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Karen Lindke
AZ 85901-6565↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Olivier Leroy
AZ 86336-6320↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Nancy Heintz
AZ 85248-6176↓
No attachments
Dear Bernice Manuelito,
You must kill this crazy mind idea.
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application i...↓s significantly less protective of Arizona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Mansur Johnson
AZ 85741-3470↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Norma Kafer
AZ 85007-1524↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Kirsty MacCalman
AZ 85716-1116↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Stephanie Vo
AZ 85340-4167↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Melanie Mouras
AZ 85615-0309↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Jeffrey Blackman
AZ 85717-1624↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
robert crenshaw
AZ 85021-8521↓
No attachments
Dear Bernice Manuelito,
I am a citizen, born and life-long resident of Southern Arizona. I’m very concerned that the plan proposed in Hudbay Minerals’ application is significantly less protective of Arizona’s public health, environment and ground...↓water than the designs submitted by the previous owners of the Rosemont Mine.
Thankfully, responsible government rejected the Rosemont corporate plan to destroy habitat and groundwater critical to citizens and natural resources in our area. The present proposal of another foreign corporation to do even more damage should be rejected by all government agencies, just as it is by all residents of the threatened region. I and my family join the petition presented herein with all of our hearts and minds. We are grateful for responsible government agencies which renders physical resistance of the people against destruction of our water and natural resources a last resort. Please keep in mind that tourism is our biggest economic sector - ie, citizens and people from far away places come here specifically to enjoy the beauty threatened by this foreign mining company.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Joel Parris
AZ 85745-8746↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Louise Stark
AZ 85007-1735↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine. I also note that mining companies in Arizona have a long history of walking away from their polluted mines when economics turn against them.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
michael brun
AZ 85716-2804↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Gilbert Flores
AZ 85029-3846↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Cheryl Goodberg
AZ 85658-4094↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Amy Douglass
AZ 85286-4452↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Cecilia Laspisa
AZ 85748-3820↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
John and Robbie Wertin
AZ 85541-3374↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Dinah Bahlman
AZ 85024-4196↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Rosemary Haas
AZ 85259-3217↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Linda Stitt
AZ 85615-9434↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Susan Soltis
AZ 85250-6147↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Cheryl Vana
AZ 85194-8504↓
No attachments
Dear Bernice Manuelito,
I truly can’t believe that ADEQ is considering this aquifer “protection” permit! The north slope of the Santa Rita range is such an important sub-surface contributor to the Tucson Basin aquifer! Water quality and future a...↓vailability is Tucson’s greatest challenge. Is the financial success of Hudbay Minerals more important?? Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Arizona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
John Luepke
AZ 85643-7543↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Michael Costa
AZ 86301-2912↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Debra Bradford
AZ 86301-5630↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Sherry Massie
AZ 85748-3852↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Alexia Ferranti-Neilson
AZ 85710-2261↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Judith Parker
AZ 85704-6946↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Anna Grizzle
AZ 86409-1408↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Lisa Williamson
AZ 85712-1820↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Margo Wollenberg
AZ 85603↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested. TUCSON CAN'T SPARE THE WATER.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Ann Markow
AZ 85016-2343↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Saeko Yamauchi
AZ 85207-7415↓
No attachments
Dear Bernice Manuelito,
Thank you for the chance to submit comments on the Copper World project's draft aquifer-protection permit. I’m concerned that the plan design proposed in Hudbay Minerals’ application is significantly less protective of Ariz...↓ona’s public health, environment and groundwater than the designs submitted by the previous owners of the Rosemont Mine.
Hudbay Minerals’ application proposes to use water to convey tailings in a slurry pipeline, operate an unlined tailings facility, leave waste-rock dumps uncovered at closure, and deploy inadequate monitoring systems. The planned processing facilities, including a heap leach for processing significant amounts of acid, will be much closer to Tucson and Sahuarita’s municipal water supplies and rural domestic wells than previously suggested.
The current draft permit proposed by the Arizona Department of Environmental Quality appears to be dangerously indulgent of the polluter at the expense of people and the environment. That’s unacceptable. So I request that the Arizona Department of Environmental Quality protects the state’s water and public health by including the following stringent requirements in the aquifer-protection permit:
1. Hudbay Minerals must complete an economic and practical evaluation of tailings-storage facilities alternatives, including a lined and dry-stacked facility, among other potential redesigns.
2. Hudbay Minerals must include the entire east pit and the headwaters of small streams near the Broadtop Butte and Copper World pits in the Pollutant Management Area for Copper World’s Phase 1, which will provide the best chance of detecting contaminants.
3. Hudbay Minerals must establish two additional point-of-compliance wells to ensure that the east-side aquifer isn’t impaired by operations at the east pit.
4. The Arizona Department of Environmental Quality must define a minimum frequency of waste-rock acid content analysis for continued operations following the first year.
5. Hudbay Minerals must submit to biannual rather than biennial monitoring of the expanded list of parameters listed in Table 20 in the APP — which will aid in detection of pollutants that may otherwise go undetected for too long and delay an investigation into the pollution and the implementation of a remedy.
Finally, I request better deployment of industry-standard technologies by Hudbay Minerals for minimizing pollution, and I ask that the Arizona Department of Environmental Quality require the additional permit conditions, requirements and agency reviews detailed in the technical comments submitted by Pima County staff to your agency on March 11, 2024.
Sincerely,
Robin Goldansky
AZ 85254-5821↓
No attachments
[